April 2013

Tunneling for the Kane County Division of Transportation’s 140-foot long South Street Tunnel has broken through the east side under Randall Road.  WBK provided Phase I and Phase II structural and civil engineering of this bicycle/pedestrian tunnel under Randall Road. The project is approximately 1,200’ in length and includes a 140-foot long, 12-foot inside diameter concrete jacking pipe that was bored and jacked in place. 

Phase I engineering included a comprehensive preliminary...