October 2014

The Village of Carol Stream celebrated the successful completion of its project to replace the Illini Street Bridge over Klein Creek with a ribbon cutting ceremony on October 27th. WBK performed Phase I, II and III services for the project. The existing Illini Drive Bridge was a two span 20.8 foot long pre-stressed concrete slab bridge over Klein Creek constructed in 1974. In 1993, the Village built a reinforced concrete slab over the old deck beams to help distribute the load on the existing structure. During a routine bridge inspection conducted in 2011 it...