St. Charles Office
- St. Charles Office 116 W. Main Street, Suite 201 St. Charles, Illinois 60174
630.443.7755
Battle Creek Office
- 68 E. Michigan Avenue
Battle Creek, Michigan 49017
269.224.3182
Home / Private: Services / Transportation / Indian Trail Road Reconstruction & Widening
WBK completed the Phase I Project Development Report, Phase II Engineering Services, and Phase III Construction Engineering Services for the reconstruction and widening of Indian Trail Road for the City of Aurora. Indian Trail Road, FAU Route 1503, is located in the City of Aurora, with the limits of the project extending from Church Road on the west to Farnsworth Avenue on the east, a length of approximately one mile with an average daily traffic count (ADT) of 26,000. The existing facility was a 4-lane rural section without medians located in a predominantly residential area. The proposed facility has been widened to a 5-lane urban section with HMA surface and base courses, curb and gutter, raised median, traffic signals, street lighting, multi-use path, thermoplastic pavement markings, landscaping with an emphasis on the median landscaping.
Phase I, II and III engineering services for roadway
© Copyright 2023 WBK Engineering | All Rights Reserved | Terms & Conditions | Sitemap