St. Charles Office
- St. Charles Office 116 W. Main Street, Suite 201 St. Charles, Illinois 60174
630.443.7755
Battle Creek Office
- 68 E. Michigan Avenue
Battle Creek, Michigan 49017
269.224.3182
WBK was recently selected by the Illinois State Toll Highway Authority (ISTHA) for a Systemwide, Design Upon Request (DUR) on its last Professional Services Bulletin (PSB) 20-1. This is WBK’s first contract with ISTHA as a Prime. This project has a 28.0% D/M/WBE participation goal and 3.0% VOS/SDVOSBE participation goal. WBK is required to provide Phase II engineering services for work tasks that may include preparation of contract plans and engineering studies and other technical services as directed by the Tollway. Typical tasks will include projects that are required for the Tollway system, and may include, but not be limited to: Structural preservation, Ramp rehabilitation, Sign and wall repairs, Intermittent pavement repair, On call and as- needed work related on the Tollway system. Contract value is $2.5 million.
© Copyright 2023 WBK Engineering | All Rights Reserved | Terms & Conditions | Sitemap